Solar panels Sussex

Across Sussex

Commercial solar panels for Sussex businesses

Solar panels can help businesses, farms, schools and charities across Sussex cut the cost of the electricity they use during the working day. This page explains how commercial solar is priced, how VAT and tax relief work, and what to ask before you commit, and you can request up to 3 free, no obligation quotes from local installers.

Why commercial solar works differently

Many businesses use most of their electricity in daylight hours, which is exactly when solar panels generate. Offices, workshops, warehouses, shops, farms, hotels and community buildings often have large roofs and steady daytime demand, so a bigger share of the electricity produced can be used on site rather than exported. Every unit you use yourself is a unit you do not have to buy from your supplier.

Commercial projects also differ from home installations in scale, paperwork and tax. Systems are usually larger, VAT is charged at the standard rate, tax relief may be available, and bigger systems need agreement from the network operator before they connect. The sections below go through each of these in turn.

How much commercial solar costs per kW

Commercial solar is usually priced per kW or kWp of capacity, and the cost per kW tends to fall as systems get bigger, because fixed costs such as design, scaffolding and connection are spread over more panels. Different sources give different ranges, so here they are side by side, each as published.

SourceSystem sizeCost per kW
HeatableSMEs, systems up to 50kWp£800 to £1,300 per kWp
HeatableLarger systems, including installation£700 to £1,000 per kWp
ExpertSure10kW£1,300 to £1,500 per kW
ExpertSure50kWRoughly £660 to £1,200 per kW
ExpertSure100kW£600 to £1,200 per kW
ExpertSureOver 250kW£700 to £900 per kW
pv magazine, reporting DESNZ data for 2024 to 202510 to 50kW, median£1,256 per kW

Sources: Heatable, Solar for Business (last updated 16 October 2026); ExpertSure, Commercial solar panels (modified 3 July 2026, prices verified October 2026); pv magazine reporting DESNZ median cost data for 2024 to 2025. UK wide figures, VAT not stated.

Heatable gives two worked examples: a 30kWp system at £24,000 to £39,000, and a 100kWp system at £70,000 to £100,000. The DESNZ median of £1,256 per kW for 10 to 50kW systems, reported by pv magazine, sits inside both the Heatable and ExpertSure ranges, which suggests those ranges are a reasonable starting point. Your own price will depend on the roof, access, the equipment chosen, how far the panels are from your main electrical board and whether any grid work is needed. None of these figures are specific to Sussex, which is why comparing several quotes for your own site matters.

VAT at 20% and reclaiming it

The 0% VAT rate on solar panels only applies to residential accommodation. ExpertSure says commercial solar and battery installations are standard rated at 20% VAT, and Armstrong Watson confirms that commercial solar, battery and renewable projects continue to be subject to the 20% standard rate.

If your business is VAT registered, ExpertSure says you can reclaim that VAT in the usual way. Charities, community groups and businesses that are not VAT registered may not be able to reclaim it, so the 20% becomes a real cost. Make sure every quote you receive shows clearly whether prices include or exclude VAT, so you are comparing like with like.

Capital allowances and tax relief

Solar panels may also qualify for capital allowances. Heatable states that businesses can deduct up to £1 million of qualifying spend, including solar panels, from taxable profits in year one.

Tax rules depend on how your business is structured, whether you lease or own the building, and how the project is paid for, so speak to your accountant before you rely on any tax relief in your figures. They can tell you what applies to your circumstances and how it changes the real cost of the system.

Getting paid for exported electricity

Even a business that uses most of its own solar power will export some, particularly at weekends, on bank holidays and on bright days when demand is low. The Smart Export Guarantee means you can be paid for those exported units.

Ofgem says the Smart Export Guarantee covers installations up to 5MW, and that for solar up to 50kW the system needs an MCS certificate or equivalent. Ofgem also says all tariffs must pay more than 0p per kWh at all times. Larger systems can still take part, but the certification route is different, so ask your installer what your system will need.

Some suppliers offer tariffs aimed at organisations. Octopus Energy says its Panel Power tariff for businesses and charities pays 12p for each unit of electricity sold back to the grid. Rates change, so check the current terms with any supplier before you sign up. Our Smart Export Guarantee guide explains how export tariffs work.

Payback for commercial systems

Because businesses can often use more of their solar power on site, payback can be shorter than for a typical home. Heatable gives these indicative figures for its two example sizes.

System sizePricePayback, solar onlyPayback with a battery
30kWp£24,000 to £39,0004 to 5 years3 to 4 years
100kWp£70,000 to £100,0003 to 4 years2 to 3 years

Source: Heatable, Solar for Business, last updated 16 October 2026. Heatable is an installer. VAT not stated.

Treat these as Heatable's estimates rather than a promise. Payback varies a great deal from one business to another, depending on what you pay for electricity, how much of the solar power you use during the day, the export rate you get, the cost of your system and any tax relief you can claim. Ask each installer to show their payback workings using your own electricity bills and half hourly data if you have it.

Larger systems and grid connection

Every system must be registered with the Distribution Network Operator, which in Sussex is UK Power Networks. For larger commercial systems this usually means applying for agreement before installation under the process known as G99, rather than simply notifying the operator afterwards. The network operator studies whether the local network can take the extra generation and may set conditions, such as limiting how much you can export.

This can take time and can add cost. Sunsave, for example, lists a three phase switch for G99 approval at around £5,700. Ask each installer whether your design needs a G99 application, who will make it, and whether any network costs are included in the quote or would be extra.

Roof surveys and building checks

Commercial roofs vary widely, from profiled metal sheeting on industrial units to flat membrane roofs on offices and older slate or tile roofs on farm buildings and village halls. A survey should look at the roof covering, its remaining life and whether the structure can carry the extra load. The Planning Portal says the ability of an existing roof to carry the weight of the panels will need to be proven, and Building Regulations also apply to the electrical work.

If your roof is nearing the end of its life, it often makes sense to repair or replace it before the panels go on, rather than removing them later. Fragile roof materials such as some older sheeting also mean installers need a careful plan for safe access. If you lease your premises, check with your landlord early, as you are likely to need their consent. Planning rules for non domestic buildings are not the same as for houses, so ask the installer or your local planning authority whether your project needs permission.

Choosing an installer for a commercial project

Commercial solar is a significant investment, so take time to compare proposals. Ask each installer for the following, and verify what you can yourself.

  • Their MCS number if your system is 50kW or smaller, which you can look up on the MCS website, and the certification route for anything larger.
  • Details of similar commercial projects and references you can contact.
  • A generation estimate based on your roof, with the assumptions explained, and a payback calculation based on your own usage.
  • Which competent person scheme or other route will be used to certify the electrical work.
  • Who handles the network operator application and any associated costs.
  • Product and workmanship warranties, proof of insurance, and a written quote showing prices with and without VAT.

Our guide to choosing a solar installer has more on what to ask, and our battery storage page explains how storage can shift solar power into the evening for businesses that open late.

Get free commercial solar quotes in Sussex

Up to 3 free, no obligation quotes from local solar installers. Our phone line and enquiries are open 24 hours, 7 days a week.

We pass your details to up to 3 local solar installers so they can contact you. See our privacy policy.

Frequently asked questions

Sources for the prices on this page

Prices are copied from each source as published and are a guide only. They are not quotes from installers in our network, and your own quotes will depend on your home and the work needed.