Most homes in Sussex can have solar panels fitted without applying for planning permission, because they count as permitted development. New rules came into force on 27 August 2026, and there are important exceptions for listed buildings, conservation areas, the South Downs National Park, flats and ground mounted systems. This guide explains the rules for England and when you should check with your council first.

Permitted development in brief

Permitted development rights let you carry out certain types of work without a full planning application, as long as you stay within set limits. The Energy Saving Trust says solar panels on houses are considered permitted development and do not usually need planning permission, with the main exceptions being listed buildings, conservation areas and national parks.

The rules described on this page are the Planning Portal's guidance for England. The Planning Portal notes that the policy in Wales may differ. All of Sussex is in England, so these are the rules that apply to homes here.

The new rules from 27 August 2026

The Planning Portal says changes to permitted development for domestic solar came into force on 27 August 2026. The rules are now split between houses and blocks of flats, and plug-in solar has been clarified as allowed.

There is a transition period. For 12 months from 27 August 2026, you may use either the old rules or the new rules. If you are planning an installation during that period and it does not fit neatly under one set of rules, ask your installer which set they are relying on, or check with your council.

Panels on the roof or walls of a house

For most Sussex homeowners, these are the rules that matter. The Planning Portal sets the following limits for solar equipment mounted on a house.

Where the panels goMain permitted development limit
Pitched roofPanels should not be installed above the highest part of the roof, excluding the chimney, and should project no more than 200mm from the roof slope
Flat roofThe highest part of the solar equipment cannot be more than 600mm higher than the highest part of the roof. In conservation areas and similar protected land, flat roof installs need prior approval
Wall, balcony or roof enclosure next to a highwayShould not protrude more than 0.2 metres beyond the plane of the wall
Wall, balcony or roof enclosure elsewhereShould not protrude more than 0.4 metres beyond the plane of the wall

Source: Planning Portal, "Solar equipment mounted on a house, block of flats or building", rules in force from 27 August 2026, England only.

A typical installation on a pitched roof, with panels sitting close to the tiles and below the ridge, will usually fall within these limits. Flat roofs, which are common on extensions and some modern homes, often use frames to tilt the panels, so the 600mm height limit is worth checking with your installer.

Flats and blocks of flats

Under the new rules, flats have their own category. The Planning Portal says the same limit applies that panels must not go above the highest part of the roof, and that panels should project no more than 200mm from the wall surface or, where relevant, the roof slope.

If you live in a flat, planning is only one part of the picture. Leaseholders may need permission from their landlord or freeholder, according to the Planning Portal, and the roof of a block is often shared or owned by the freeholder. Check your lease and speak to your freeholder or managing agent before getting quotes.

Ground mounted solar panels

If your roof is not suitable, you may be able to put panels in your garden. The Planning Portal sets separate limits for stand-alone solar within the grounds of a house.

  • Height: 1m if within 5m of the boundary and forward of the principal elevation of the house, 2m if within 5m of the boundary, 2m in a conservation area, and otherwise 4m.
  • Size: the array should be no more than 9 square metres.
  • Listed buildings and scheduled monuments: ground mounted solar is not permitted development within their grounds.
  • Flats: only the first stand-alone solar installation will be permitted development, with a maximum height of 4m, at least 5m from the boundary and no more than 9 square metres.

Anything larger or taller than these limits would need a planning application.

Listed buildings

Sussex has many listed buildings, from Regency terraces in Brighton and Hove to old cottages and farmhouses in the villages. The Planning Portal says panels must not be installed on a building that is within the grounds of a listed building under permitted development, and ground mounted panels are not permitted within the grounds of a listed building either.

That does not always mean solar is impossible, but you will need to apply. Work to a listed building can also need listed building consent, which is separate from planning permission. Speak to your council's planning or conservation team early, before paying for any design work.

Conservation areas and the South Downs National Park

Conservation areas are common across Sussex, covering historic town centres, seafronts and village cores. In conservation areas and World Heritage Sites, the Planning Portal says panels must not be fitted to a wall, balcony or roof enclosure which fronts a highway. For flats, this applies only to a wall which fronts a highway. Flat roof installations in conservation areas and similar protected land need prior approval, and ground mounted panels in a conservation area are limited to 2m in height.

Protected land of this kind, known in the rules as Article 2(3) land, also includes national parks. The South Downs National Park covers a large part of Sussex, including towns such as Lewes and Midhurst and many downland villages. The Energy Saving Trust names national parks as one of the exceptions where planning permission may be needed. If your home is in the national park, the South Downs National Park Authority is the planning authority, and it is worth checking with it before you go ahead.

If you are not sure whether your home is in a conservation area or the national park, your council's website will usually have maps, or you can ask the planning department.

Plug-in solar

Small plug-in solar panels, sometimes called balcony solar, are now clearly covered. The Planning Portal blog says the new rules clarify that plug-in solar is allowed. The Planning Portal guidance adds one restriction: plug-in solar must not go on a wooden wall, balcony or enclosure, or any exterior clad in timber. Leaseholders should still check their lease and ask their landlord or freeholder.

Building Regulations and DNO registration

Even when you do not need planning permission, Building Regulations still apply. The Planning Portal says the ability of the existing roof to carry the load of the panels will need to be checked and proven, and that Building Regulations also apply to other aspects of the work such as the electrical installation.

The Planning Portal recommends using an installer, preferably one who belongs to a competent person scheme. GOV.UK says registered installers can self certify that their work is compliant, should notify the local authority of the work, and should issue you a certificate of compliance, which you should receive within 30 days of the work being finished. Ask any installer which competent person scheme they belong to, and keep the certificate safe, as you will need it if you sell your home.

Your system also needs to be registered with the Distribution Network Operator, the company that runs the local electricity network. The Energy Saving Trust says this is usually done by the installer, but it is worth confirming it is included in your quote.

Planning authorities in Sussex and checking with your council

Planning decisions for homes are made by your local planning authority, which is your district, borough or city council, or the South Downs National Park Authority if you live inside the national park. County councils do not normally handle householder planning applications.

  • Brighton and Hove City Council for Brighton, Hove, Portslade and the rest of the city outside the national park.
  • In East Sussex: Lewes District Council, Wealden District Council, Rother District Council, Eastbourne Borough Council and Hastings Borough Council.
  • In West Sussex: Adur and Worthing Councils, Arun District Council, Chichester District Council, Crawley Borough Council, Horsham District Council and Mid Sussex District Council.
  • The South Downs National Park Authority for homes inside the national park boundary, which crosses several of the districts above.

If your project is close to any of the limits on this page, or your home is listed, in a conservation area or in the national park, contact your planning authority before you commit. You can also apply for a lawful development certificate if you want formal confirmation that your installation is permitted development. When you are ready, Solar panels Sussex can pass your enquiry to up to 3 local solar installers for free, no obligation quotes. Call 01273 115520 or use the form on this page, open 24 hours, 7 days a week.

Get free solar quotes in Sussex

Up to 3 free, no obligation quotes from local solar installers. Our phone line and enquiries are open 24 hours, 7 days a week.

We pass your details to up to 3 local solar installers so they can contact you. See our privacy policy.

Frequently asked questions

Sources for this page

Prices are copied from each source as published and are a guide only. They are not quotes from installers in our network, and your own quotes will depend on your home and the work needed.